;

Rotarians Hear About Proposed Capital Project

FULTON, NY – Fulton Rotarian and Superintendent of Schools Bill Lynch introduced the school district’s business administrator, Kathy Nichols, to the Fulton Noon Rotary Club at a recent meeting.

" data-medium-file="https://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project-300x224.jpg" data-large-file="https://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project-460x344.jpg" class="size-medium wp-image-135571" alt="Bill Lynch and Kathy Nichols" src="http://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project-300x224.jpg" width="300" height="224" srcset="https://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project-300x224.jpg 300w, https://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project-150x112.jpg 150w, https://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project-460x344.jpg 460w, https://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project-400x300.jpg 400w, https://oswegocountytoday.com/wp-content/uploads/2014/01/Rotarians-Hear-About-Proposed-Capital-Project.jpg 900w" sizes="(max-width: 300px) 100vw, 300px" />
Bill Lynch and Kathy Nichols

She explained the $4.4 million Capital Project that is to be voted on by the taxpayers on February 4.

This project focuses on the needs of the physical buildings.

The items to be rebuilt are: Lanigan gym floor, district-wide lock sets for safe lockdown, athletic storage building at the athletic complex and roof replacements at Lanigan and Granby buildings.

The work will be done during the 2014-2015 school years at a cost to local taxpayers of about 1% of the total $4.4 million.

The Rotarians urge everyone to vote on February 4.