Water Project Will Result In Outages At Times
During 2014, the Riley School water tank that supplies system pressure to the Oak Hill section of the eastside of Oswego City is being replaced by a new pump station. Part of that project will be to replace all the system check valves that maintain the water pressure at the top of Oak Hill. The work to replace those check valves will be done during the months of August and September, and will require periodic isolations of the water mains in the immediate areas where the replacements are being done.