PHOTO C

PHOTO C

At Granby Elementary School, the pool’s air handling units would be replaced and improve ventilation to dramatically reduce corrosion of the school’s boilers (above), and pumps to extend their operation life. In addition pool security will be increased, the west parking lot will be reconstructed within the loop, and parking will be expanded to include a new lot at the east bus loop. Upgrades would be made to the fire alarm system, and the main office suite would be renovated to improve security at the building’s entrance.