PHOTO E

PHOTO E

Major improvements that would be made to the athletic complex include: replacement of the ten-year-old synthetic turf field (above) which will be replaced at the latter part of the project to maximize state aid; reconstruction and recoating the existing track; adding railings to bleacher aisles; replacement of the roof of the athletic complex building which houses locker rooms, restroom facilities, and the concession stand; and installation of a fiber optic line to the building to enable live broadcasting of events.